Weekend Closures & Restrictions on Valley Freeways, Weekend of February 3 - 6, 2012

1
I-10 eastbound closed between I-17 and Seventh St. near downtown Phoenix for tunnel cleaning and overhead sign installation. All traffic detoured onto I-17; I-10 eastbound drivers can also use I-17 southbound to reconnect with I-10 at 24th St. near Phoenix Sky Harbor International Airport.
9 p.m. Friday – 7 a.m. Saturday
(February 4)
 
 
 
2
I-10 westbound closed between Seventh St. and Seventh Ave. near downtown Phoenix for tunnel cleaning and overhead sign installation. Multiple ramps closed near work zone. Traffic will exit at Seventh St. and use McDowell Rd. to Seventh Ave. I-10 westbound drivers can also use I-17 to the Stack interchange to bypass tunnel closure.
9 p.m. Saturday – 7 a.m. Sunday
(February 5)
 
 
 
3
SR 143 southbound closed between McDowell Rd. and University Dr. for structure painting and sign work. Connecting ramps to SR 143 southbound from Sky Harbor Blvd. westbound and Loop 202 eastbound also closed. Drivers can use 44th St. to University Dr.
10 p.m. Friday – 5 a.m. Monday
(February 6)
 
 
 
4
SR 85 northbound ramp to I-10 eastbound closed for guard rail repair. Consider using Broadway Rd. to Miller Rd.
9 p.m. Sunday – 3 a.m. Monday
(February 6)


Please note
: Other overnight restrictions are possible. If planning to travel overnight, please check www.ValleyFreeways.com/OtherRestrictions.


State Highway Restrictions to Note:

Northern Arizona Travel: Expect lane restrictions and detours near I-17 and SR 69 interchange for bridge construction at Cordes Junction. Obey reduced speed limits in work zones.

Kingman and Las Vegas Travel: US 93 work zone north of Wikieup (starting at MP109) for widening project. No passing. Delays up to 15 minutes possible. 7 a.m. to 5 p.m. Monday-Thursday and 7 a.m. to 3 p.m. Fridays.

Southern AZ travel: 30-minute delay scheduled on eastbound I-10 at SR 90 near Benson beginning 7 a.m. Sunday (February 5) to accommodate oversized load.